Bandung, Aktual.com – PT Kereta Api Indonesia (KAI) operational area (Daop) II Bandung, West Java, declared ready to serve travelers in Idul Fitri 2016. The assurance was conveyed by Director (CEO) of PT KAI Edi Sukmoro when doing the inspection in Daop Kiaracondong Station II Bandung , Bandung, Tuesday (28/6).
However, he acknowledges there are still 320 points prone to look out across Daop. Blackspots in the form of lines prone to landslides, flooding, soil plummeted, and other disorders dependent situational. For Daop II, the most vulnerable point in the direction of the southbound lanes. “There are 45 points,” he said.
Said Edi, PT KAI coordinate with the police and military to anticipate such vulnerable spots. Namely to spread 4,223 personnel to do surveillance. Material that may be required if no incident has also been prepared.
Meanwhile, Daop II serve the homecoming passenger, Edi said, especially for Kiaracondong stations are ready. From the results of the inspection, there is no problem for either fleet infrastructure and the departure station and arrival in the region Daop II Bandung.
Artikel ini ditulis oleh: